Applied R&M Manual for Defence Systems

(GR-77 Issue 2011)

 

Part G - Miscellaneous

This section compliments the other sections by providing a number of useful leaflets, templates, terms of reference and other documents and papers to encourage and enable the successful management of R&M acquisition and development programmes.

Leaflets

Leaflet 1         The Case for R&M

An argument for developing and presenting evidence to build confidence in the level of system R&M.

Leaflet 2         Aide Memoir foe R&M Focal Points

This leaflet provides R&M Focal Points with guidelines on how to review frequently encountered R&M documents produced in support of R&M Case, R&M Case Reports or part of an R&M Programme.

Leaflet 3         R&M Engineering Standards

A preferred list of R&M standard, compiled by CoDERM, which are in regular use by the MOD and its partners in Industry.  The Standards List can be accessed directly from this link: Standards List (link)

Leaflet 4         The Importance of Maintainability in Achieving Operational Availability

The retention of equipment in a state to deliver a capability on demand doesn’t just happen; it requires preparation and planning beforehand.  This guidance discusses the drivers for the optimisation of the maintainability aspects of this preparation.

Leaflet 5         Contracting for Availability

Contracting for Availability is a commercial process which seeks to sustain a system or capability for a given period of time at an agreed level of readiness.  This guide addresses the significant issues relating to R&M which should be considered during the Contacting for Availability process and addressed by Availability Contracts.

 

For a printable version of this page click here

Version 1.2